2007 SMSC Water Report: Sioux Trail
<< back to water reports previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | next

New Water TowerNew Water Tower Completed
The 100,000-gallon water tower on Flandreau Trail (across from Mystic Lake Casino Hotel and the fire station) was taken down in 2005. It was cut into five pieces and transported by truck to its new home at the McKenna Road Water Treatment Plant where it was operational in mid-2007. It has a 400 gpm gravity filtration system that removes the majority of iron and manganese from the water supply. A new 1,000,000-gallon water tower was constructed on Flandreau Trail and has been operational since the fall of 2006. This gives the water system more consistent water pressure and aids in fire protection.

For more information contact:
Shakopee Mdewakanton Sioux Community
Public Works Department
Jeremy Gosewisch, Director
2975 Dakotah Parkway
Prior Lake, Minnesota 55372


<< back to water reports previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | next


 
Mystic Lake Casino HotelThe MeadowsDakotah! Sport & FitnessPlayworksLink Event CenterDakota MeadowsShakopee Dakota Convenience Store